ENERGY

Construction of the 750 kV Belozerskaya–Leningradskaya Overhead Transmission Line

back to list ENERGY About project Construction of the 750 kV Belozerskaya–Leningradskaya Overhead Transmission Line (Section between Towers 25 and 44) for the Needs of the Central Power Grids Branch of PJSC FGC UES Project objective Improve the reliability of electricity supply to consumers in the Northwestern and Central Federal Districts of Russia. Outcome Infrastructure was established to ensure a high level of safety and readiness to respond to incidents during a major international event. Project scope: – Construction and installation works for the 750 kV Belozerskaya–Leningradskaya overhead transmission line. previous

Construction of the 750 kV Belozerskaya–Leningradskaya Overhead Transmission Line Read More »

Construction of the 500 kV Ekibastuz–Shulbinskaya HPP–Ust-Kamenogorsk Overhead Transmission Line

back to list ENERGY About project Construction of the 500 kV Shulbinskaya HPP (Semey)–Aktogay–Taldykorgan–Almaty Overhead Transmission Line Project objective Increase the transmission capacity of the North–East power network corridor to help cover electricity shortages in the East Kazakhstan Region, independently of electricity transit through the Unified Power System of Russia. The project is also essential to ensure the full power output of the Shulbinskaya HPP, increasing its capacity from the current 135 MW to 700 MW following the commissioning of the Bulak HPP counter-regulator. Project scope: – Construction of the 500 kV overhead transmission line connecting Semey 500 kV Substation and Ust-Kamenogorsk 500 kV Substation, with the installation of optical ground wire (OPGW). previous

Construction of the 500 kV Ekibastuz–Shulbinskaya HPP–Ust-Kamenogorsk Overhead Transmission Line Read More »

Construction of the 500 kV Overhead Transmission Line at Shulbinskaya HPP

back to list ENERGY About project Construction of the 500 kV Overhead Transmission Line: Shulbinskaya HPP (Semey) – Aktogay – Taldykorgan – Almaty Project objectives Improve the reliability of electricity supply to the eastern and southern regions of Kazakhstan Meet the electricity demand of railway sections undergoing electrification and energy-intensive mining facilities Create conditions for the development of border regions and enable electricity exports to China Outcome Infrastructure was established to ensure a high level of safety and incident readiness for a major international event. Project scope Construction of the 220 kV overhead transmission line connecting Semey 500 kV Substation and the Shulbinskaya HPP outdoor switchyard Construction of the 220 kV overhead transmission line tie-ins from Substation 51 and Substation 18 to Semey 500 kV Substation Construction of the 220 kV overhead transmission line tie-ins from Substation 18 and Shulbinskaya HPP to Semey 500 kV Substation Total overhead transmission line length: 102 km previous

Construction of the 500 kV Overhead Transmission Line at Shulbinskaya HPP Read More »

Reconstruction of Six 220 kV Switchgear Bays

back to list ENERGY About project Reconstruction of Six 220 kV Switchgear Bays with Installation of Additional Disconnectors on Busbar Systems 1 and 2 at the 1,150 kV Kokshetau Substation Project objective Improve the reliability of electricity supply to consumers in Northern Kazakhstan. Outcome Infrastructure was established to ensure a high level of safety and incident readiness for a major international event. Project scope – Construction and installation works for the reconstruction of six 220 kV switchgear bays, including the installation of additional disconnectors on 220 kV busbar systems 1 and 2 at the 1,150 kV Kokshetau Substation. previous

Reconstruction of Six 220 kV Switchgear Bays Read More »

Reconstruction of the 220 kV Tsentralnaya Substation

back to list ENERGY About project Reconstruction of the 220 kV Tsentralnaya Substation (220 kV Outdoor Switchyard, including replacement of oil circuit breakers, current transformers, disconnectors, and voltage transformers) Project objective Modernize the existing power grid to accommodate increased loads. Outcome Improved the safety, monitoring, and automation of the water pipeline facilities. The facility ensures a stable water supply to the regions. Project scope Construction and installation works for the reconstruction of the 220 kV Tsentralnaya Substation Reconstruction of the 220 kV outdoor switchyard, including replacement of oil circuit breakers, current transformers, disconnectors, and voltage transformers previous

Reconstruction of the 220 kV Tsentralnaya Substation Read More »

Reconstruction of the 220 kV Outdoor Switchyard with SF₆ Circuit Breaker Replacement

back to list ENERGY About project Reconstruction of the 220 kV Outdoor Switchyard with Replacement of SF₆ Circuit Breakers VGП-220-40/2500U1 at Sh. Chokin Kapshagay HPP, Almaty Power Plants JSC Project objective Improve the operational reliability of the 220 kV outdoor switchyard equipment, reduce the risk of equipment failures and prolonged downtime caused by emergency repairs, and minimize electricity losses and auxiliary power consumption. Project scope Preparation of design and cost estimate documentation Dismantling and installation works Supply of switching equipment Acceptance testing Commissioning and putting the equipment into operation previous

Reconstruction of the 220 kV Outdoor Switchyard with SF₆ Circuit Breaker Replacement Read More »

Reconstruction of 220 kV Overhead Transmission Lines at KEGOC JSC’s Aktobe and Western Interregional Electric Networks Branches

back to list ENERGY About project Construction of the 110/35/10 kV Soltustik Substation, with a capacity of 2 × 25 MVA, and a 110 kV transmission line along the Kyzylorda Highway in Turkistan Project objective Modernize the existing power grid to accommodate increased loads from industrial facilities and improve network reliability. Outcome Works completed. Project scope Reconstruction of overhead transmission lines (OHLs), including the required engineering surveys, preparation and approval of design and cost estimate documentation (including environmental impact assessment documentation), factory acceptance testing, and supply of equipment, materials, and spare parts. The scope also included dismantling, construction, installation, commissioning, and putting the following facilities into operation: Reconstruction of the 220 kV OHL L-2012 Kempirsay–Orskaya Reconstruction of the 220 kV OHL L-2022 Kempirsay–Akzhar and L-2092 Akzhar–Aktyubinskaya Reconstruction of the 220 kV OHL L-2032 Orskaya–Aktyubinskaya Reconstruction of the 220 kV OHL L-2502 Uralskaya–Stepnaya Reconstruction of the 220 kV OHL L-2522 Kinel–Uralskaya Reconstruction of the 220 kV OHL L-2582 Stepnaya–Yuzhnaya Reconstruction of the 220 kV OHL L-2540 Pravoberezhnaya–Inder previous

Reconstruction of 220 kV Overhead Transmission Lines at KEGOC JSC’s Aktobe and Western Interregional Electric Networks Branches Read More »

Expansion of the 220 kV Outdoor Switchyard at Shulbinskaya HPP

back to list ENERGY About project Expansion of the 220 kV Outdoor Switchyard at Shulbinskaya HPP (ShHPP) as part of the 500 kV Ekibastuz–ShHPP–Ust-Kamenogorsk Transmission Line Construction Project Project objective Meet the electricity demand of railway sections undergoing electrification and energy-intensive facilities in the mining industry. Project scope – Reconstruction and expansion of the 220 kV outdoor switchyard at Shulbinskaya HPP. previous

Expansion of the 220 kV Outdoor Switchyard at Shulbinskaya HPP Read More »

Integration of the Western Kazakhstan Power System into the Unified Power System of Kazakhstan

back to list ENERGY About project Construction of Power Grid Facilities: 500 kV Overhead Transmission Line from Ulke 500 kV Substation to Karabatan 500 kV Substation Project objective Improve the reliability and extend the service life of the 500 kV overhead transmission line, strengthen the connection between the Western Kazakhstan Power System and the Unified Power System of Kazakhstan, and expand and construct 500 kV substations. Outcome Project scope Preparation of design and cost estimate documentation Supply of materials and spare parts Dismantling, construction, installation, and commissioning works, followed by putting the facility into operation Integration of the Western Kazakhstan Power System into the Unified Power System of Kazakhstan Construction of power grid facilities Construction of the 500 kV overhead transmission line connecting Ulke 500 kV Substation and Karabatan 500 kV Substation previous

Integration of the Western Kazakhstan Power System into the Unified Power System of Kazakhstan Read More »

“Working design” – Construction of the 110/35/10 kV Soltustik Substation

back to list previous ENERGY About project Construction of the 110/35/10 kV Soltustik Substation, with a capacity of 2 × 25 MVA, and a 110 kV transmission line along the Kyzylorda Highway in Turkistan Project objective To improve the reliability of the 110 kV Soltustik Substation and extend the trouble-free service life of its electrical equipment. Project scope: Construction of the 110 kV Soltustik Substation. Installation of switching equipment at the 110 kV substation, including construction of an equipment access platform. Installation of a floodlight mast. Installation and commissioning of equipment, including new transformers, disconnectors, and suspension insulators at the 110 kV substation. Installation of cables and conductors, followed by acceptance testing. Commissioning works and putting the facility into operation.   previous

“Working design” – Construction of the 110/35/10 kV Soltustik Substation Read More »