“Working design” – Construction of the 110/35/10 kV Soltustik Substation
- Kazakhstan
- 2021-24 г.
- State Institution "Department of Energy and Housing and Utilities of Turkistan Region"
About project
Construction of the 110/35/10 kV Soltustik Substation, with a capacity of 2 × 25 MVA, and a 110 kV transmission line along the Kyzylorda Highway in Turkistan
Project objective
To improve the reliability of the 110 kV Soltustik Substation and extend the trouble-free service life of its electrical equipment.
Project scope:
Construction of the 110 kV Soltustik Substation.
Installation of switching equipment at the 110 kV substation, including construction of an equipment access platform.
Installation of a floodlight mast.
Installation and commissioning of equipment, including new transformers, disconnectors, and suspension insulators at the 110 kV substation.
Installation of cables and conductors, followed by acceptance testing.
Commissioning works and putting the facility into operation.