Reconstruction of 220 kV Overhead Transmission Lines at KEGOC JSC’s Aktobe and Western Interregional Electric Networks Branches

About project

Construction of the 110/35/10 kV Soltustik Substation, with a capacity of 2 × 25 MVA, and a 110 kV transmission line along the Kyzylorda Highway in Turkistan

Project objective

Modernize the existing power grid to accommodate increased loads from industrial facilities and improve network reliability.

Outcome

Works completed.

Project scope

Reconstruction of overhead transmission lines (OHLs), including the required engineering surveys, preparation and approval of design and cost estimate documentation (including environmental impact assessment documentation), factory acceptance testing, and supply of equipment, materials, and spare parts. The scope also included dismantling, construction, installation, commissioning, and putting the following facilities into operation:

  • Reconstruction of the 220 kV OHL L-2012 Kempirsay–Orskaya

  • Reconstruction of the 220 kV OHL L-2022 Kempirsay–Akzhar and L-2092 Akzhar–Aktyubinskaya

  • Reconstruction of the 220 kV OHL L-2032 Orskaya–Aktyubinskaya

  • Reconstruction of the 220 kV OHL L-2502 Uralskaya–Stepnaya

  • Reconstruction of the 220 kV OHL L-2522 Kinel–Uralskaya

  • Reconstruction of the 220 kV OHL L-2582 Stepnaya–Yuzhnaya

  • Reconstruction of the 220 kV OHL L-2540 Pravoberezhnaya–Inder