Construction of the 500 kV Overhead Transmission Line at Shulbinskaya HPP

About project

Construction of the 500 kV Overhead Transmission Line: Shulbinskaya HPP (Semey) – Aktogay – Taldykorgan – Almaty

Project objectives

  • Improve the reliability of electricity supply to the eastern and southern regions of Kazakhstan

  • Meet the electricity demand of railway sections undergoing electrification and energy-intensive mining facilities

  • Create conditions for the development of border regions and enable electricity exports to China

Outcome

Infrastructure was established to ensure a high level of safety and incident readiness for a major international event.

Project scope

  • Construction of the 220 kV overhead transmission line connecting Semey 500 kV Substation and the Shulbinskaya HPP outdoor switchyard

  • Construction of the 220 kV overhead transmission line tie-ins from Substation 51 and Substation 18 to Semey 500 kV Substation

  • Construction of the 220 kV overhead transmission line tie-ins from Substation 18 and Shulbinskaya HPP to Semey 500 kV Substation

Total overhead transmission line length: 102 km