CONSTRUCTION

Construction of a Specialized Data Center Facility to Expand the MTNOC System

back to list CONSTRUCTION About project Project objective Construction of a specialized data center facility designed to house and operate hardware and software systems for data processing, storage, and transmission. The facility includes: A prefabricated modular building for housing server and telecommunications equipment (IT module). A prefabricated modular power module housing two transformer substations, main power input and distribution switchboards, uninterruptible power supply (UPS) systems, and battery banks. Diesel power generators. A prefabricated modular administrative and welfare building. A prefabricated modular security checkpoint. Engineering infrastructure required for the facility’s operation, including: External and internal power supply and lighting networks. Cooling and air conditioning systems. Centralized monitoring and control system. Security systems, including access control and management systems (ACS), fire and security alarms, video surveillance, public address and notification systems, and structured cabling systems. Gas and dry chemical fire suppression systems. Project locations: Taraz, Taldykorgan, and Semey. previous

Construction of a Specialized Data Center Facility to Expand the MTNOC System Read More »

Call Center Development and Customer Relationship Management (CRM) System Implementation

back to list CONSTRUCTION About project Call Center Construction Development of a customer relationship management (CRM) system. Work performed Major renovation of the building Design and installation of the building’s internal communications infrastructure Supply and installation of a raised access floor manufactured in Germany by Weiss Kazakhstan Supply and installation of sound-absorbing Ecophon materials from Switzerland Supply, installation, and commissioning of an Axis video surveillance system Supply and configuration of call center equipment and data storage systems previous

Call Center Development and Customer Relationship Management (CRM) System Implementation Read More »

DWDM backbone and transit network

back to list CONSTRUCTION About project Construction of the 110/35/10 kV Soltustik Substation, with a capacity of 2 × 25 MVA, and a 110 kV transmission line along the Kyzylorda Highway in Turkistan Project objective Improve the reliability of the 110 kV Soltustik Substation and extend the trouble-free service life of its electrical equipment. Project scope Construction of the 110 kV Soltustik Substation Installation of switching equipment, including construction of an equipment access platform Installation of a floodlight mast Installation and commissioning of new transformers, disconnectors, and suspension insulators Installation of cables and conductors, followed by acceptance testing Commissioning and putting the facility into operation   previous

DWDM backbone and transit network Read More »

Replacement of the Pipeline Section Between Astrakhan and Mangyshlak with Factory-Applied Insulation

back to list CONSTRUCTION About project Project objective Ensure the supply of clean water to the Kurmangazy District of Atyrau Region, with automation of the water pipeline control systems as a key component. Azimut Solutions delivered a comprehensive turnkey project, including the development of software for the supervisory control and monitoring system, automation systems, communications systems, and fire alarm systems. These solutions enable remote monitoring and control of water flow. Scope of work: Installation of automation and communications equipment. Deployment of a fire alarm system. Installation of a fiber-optic communication line (FOCL). Installation of a radio relay link (RRL). Development of supervisory control and monitoring software. Fiber-optic cable route length: 1.2 km.   previous

Replacement of the Pipeline Section Between Astrakhan and Mangyshlak with Factory-Applied Insulation Read More »

“Construction of the Kulsary–Tengiz Technical Water Pipeline”

back to list CONSTRUCTION About project Installation and commissioning of industrial automation and communication systems (IACS) The automated facilities included: Pig launcher and receiver monitoring systems (pig launching and receiving stations); Tank farm; Metering units; Pumping station; Pipeline block valves. The automation systems provide process monitoring, primary data acquisition on equipment and unit status, setpoints, and task execution, as well as data analysis and transmission of progress reports and deviations to operations personnel. As part of the project, the automation systems were designed to provide personnel with the operational data required to monitor process parameters, identify deviations and violations in the operation of the pig launching and receiving systems, plan operations, and make informed decisions regarding the management of automated systems. The implemented solution is a multi-level information and control system based on modern hardware and software, enabling interaction between operating personnel and process equipment. Fiber-optic network installation, active equipment installation and configuration The fiber-optic communication line construction project included the installation of 90 km of cable. One of the main challenges was navigating 237 crossings with existing utilities, including oil pipelines operated by the Caspian Pipeline Consortium (CPC), Tengizchevroil (TCO), and other companies. In addition to fiber-optic cable installation, the scope of work included the supply, installation, and commissioning of Cisco active network equipment, as well as IP telephony configuration. Installation and commissioning of video surveillance systems The project involved the installation of four bullet cameras mounted on a support structure and two fixed cameras, along with a video server. All required commissioning works were completed. Installation and commissioning of fire and security alarm systems The full scope of commissioning works was completed, including routing signals from all field devices to the Customer’s control room and integrating signals from all devices into the SCADA system. Installation and commissioning of automated electricity metering systems (AEMS) As part of the project, equipment manufactured by MIR Research and Production Association was supplied, installed, and commissioned.   previous

“Construction of the Kulsary–Tengiz Technical Water Pipeline” Read More »

Scroll to Top