About project

Construction of the 110/35/10 kV Soltustik Substation, with a capacity of 2 × 25 MVA, and a 110 kV transmission line along the Kyzylorda Highway in Turkistan

Project objective

Improve the reliability of the 110 kV Soltustik Substation and extend the trouble-free service life of its electrical equipment.

Project scope

  • Construction of the 110 kV Soltustik Substation

  • Installation of switching equipment, including construction of an equipment access platform

  • Installation of a floodlight mast

  • Installation and commissioning of new transformers, disconnectors, and suspension insulators

  • Installation of cables and conductors, followed by acceptance testing

  • Commissioning and putting the facility into operation

 