Construction of a 1,000 MW Combined-Cycle Power Plant in the Turkistan Region

back to list Engineering About project Project objective Prepare the design basis for the construction of a 1,000 MW combined-cycle power plant, taking into account applicable regulations, standards, and future implementation requirements. Outcome Design documentation required to commence construction of a large-scale energy infrastructure facility is being developed. Project scope: Plant-wide communications, structured cabling systems (SCS), and video surveillance. Power supply, lighting, and electrical systems (EOM). Electric heating systems for tanks and pipelines. Gas detection, fire alarm, and security alarm systems. Automation and access control systems. Adaptation of engineering systems and industrial automation and control systems (IACS). previous

Construction of a 1,000 MW Combined-Cycle Power Plant in the Turkistan Region Read More »

Construction of Astana CHP Plant No. 3 – Phase 1

back to list Engineering About project Project objective Design and implement communication, alarm, and control systems across all Astana CHP Plant No. 3 facilities, ensuring the reliability and safety of the plant’s operational infrastructure. Outcome Reliable telecommunications and engineering systems were deployed across all plant facilities, ensuring uninterrupted communications, enhanced security, and centralized control. Project scope: External telephone networks (11 km) based on fiber-optic cable (FOCL), including the VST system. On-site industrial telephone networks (approximately 100 km), including fiber-optic cables and power cables for public address systems. Telecommunications infrastructure, including structured cabling systems (SCS), active network equipment, data storage systems, and telephony. Public address and radio communication systems across all facilities. Automatic fire alarm systems across all facilities, with centralized monitoring and control stations at the hot-water boiler house and fire station. Electrical equipment and power supply systems (EOM) across all facilities to support plant-wide communications. Two-way railway yard communication system (SPDGС) at the railway station. previous

Construction of Astana CHP Plant No. 3 – Phase 1 Read More »

Modernization of Network Timing and Synchronization Equipment

back to list Engineering About project Project objective Provide Kazakhtelecom JSC’s 5G Mobile Backhaul (MBH) network with frequency and time synchronization signals in accordance with the mobile network geographic segmentation plan covering 17 cities across Kazakhstan. Status The project is currently in the technical support phase. Project scope Hardware and equipment Software Engineering infrastructure Works and services Documentation Training and knowledge transfer Service and ongoing support previous

Modernization of Network Timing and Synchronization Equipment Read More »

FEED project for the Kalamkas-Sea and Khazar fields

back to list Engineering About project Project objective Develop FEED-stage engineering documentation for the MAC, Telecommunications, and Security disciplines to estimate project costs and support the development of offshore fields in accordance with international standards. Outcome FEED-stage engineering documentation prepared to support the next phases of project implementation. Key technical solutions and cost estimates were developed for the MAC, Telecommunications, and Security disciplines. Project scope MAC: ICSS, SCADA, SIS, DCS, MES, ESD, F&G, IAMS, LDS, CEMS Telecommunications: IP PBX, WAN, VSAT, radio communications, operator workstations, Wi-Fi Security: CCTV, access control, PAGA, master clock systems, lighting Power consumption analysis and heat dissipation calculations previous

FEED project for the Kalamkas-Sea and Khazar fields Read More »

Local Public Alert System for Ust-Kamenogorsk CHP Plant

back to list Engineering About project Project objective Deliver voice announcements to plant personnel and residents of surrounding areas within the designated emergency notification zone in the event of accidents or other emergency situations. Project status The project is currently at the construction and installation stage. Project scope: Procurement and supply of materials. Construction and installation works. Equipment installation. Commissioning, start-up, and individual equipment testing. Integrated system testing and preparation of the facility for commissioning. previous

Local Public Alert System for Ust-Kamenogorsk CHP Plant Read More »

Instrument Grounding for Automated Valve Assemblies on Lines A and B at the Shymkent Gas Transmission Facility

back to list Engineering About project “Instrument Grounding System with a Resistance of No More Than 1 Ohm for Automated Valve Assemblies on Lines A and B at the Shymkent Gas Transmission Facility of Asian Gas Pipeline LLP, Kazakhstan–China Main Gas Pipeline” Project objective Perform construction and installation works in accordance with the approved working design, which has received a positive expert review. Project outcome Completed the supply of materials and all construction and installation works. Project scope: Procurement and supply of materials. General construction and installation works. Commissioning, start-up, and individual testing of equipment and systems. Integrated system testing and preparation of the facility for commissioning. Putting the facility into operation. previous

Instrument Grounding for Automated Valve Assemblies on Lines A and B at the Shymkent Gas Transmission Facility Read More »

SCADA, Communications, and Telemetry

back to list Engineering About project Project objective Develop and implement an automated control and communications system for the offshore mooring facilities (OMFs) and marine terminal, in compliance with FSTEC and Russian Maritime Register requirements. Project outcome Established reliable monitoring, communications, and security systems at the offshore mooring facilities. Installed automated systems compliant with Russian maritime standards. Project scope: RTUs and instrumentation and control systems (I&C) at CPC-1, CPC-2, and CPC-3 offshore mooring facilities. Radio communication links between the offshore facilities and the shore, including radio bridges and VHF systems. SCADA and dispatch control systems at the marine terminal. Cybersecurity systems compliant with FSTEC standards. Engineering design, installation, and commissioning. Support throughout the Russian Maritime Register review and approval process.   previous

SCADA, Communications, and Telemetry Read More »

“Development of design and cost estimate documentation for the rerouting of the fiber-optic cable from CU-47, Sections A and B, to the ACC.”

back to list Engineering About project Project objective Reroute fiber-optic cables in areas where land use designations have changed, including agricultural land (peasant farms), individual housing construction (IHC), and private subsidiary farming (PSF), as well as in locations where existing fiber-optic cable routes obstruct the construction of buildings and structures. Project outcome Received a positive review from the Comprehensive Non-Departmental Expertise (CNE). Project scope: Preparation and approval of the fiber-optic cable route alignment. Preparation of land management plans for the sections where the fiber-optic cables are to be rerouted. Development and approval of design and cost estimate documentation. Obtaining permits and technical specifications for routing fiber-optic cables across privately owned and corporate land plots. Development and approval of the environmental impact assessment (EIA) documentation. Obtaining a positive conclusion from the Comprehensive Non-Departmental Expertise.   previous

“Development of design and cost estimate documentation for the rerouting of the fiber-optic cable from CU-47, Sections A and B, to the ACC.” Read More »