Construction of a 1,000 MW Combined-Cycle Power Plant in the Turkistan Region
back to list Engineering About project Project objective Prepare the design basis for the construction of a 1,000 MW combined-cycle power plant, taking into account applicable regulations, standards, and future implementation requirements. Outcome Design documentation required to commence construction of a large-scale energy infrastructure facility is being developed. Project scope: Plant-wide communications, structured cabling systems (SCS), and video surveillance. Power supply, lighting, and electrical systems (EOM). Electric heating systems for tanks and pipelines. Gas detection, fire alarm, and security alarm systems. Automation and access control systems. Adaptation of engineering systems and industrial automation and control systems (IACS). previous